Each task type determines the information that must be recorded during the feedback process. Depending on the selected type, the task may require specific checks, responses, measurements, or validations. This allows for the collection of the necessary data for tracking its progress.
What are the different types of tasks for?
1 min read
Related articles
- What is the difference between a piece of equipment and a tool?
- What is the difference between a location and a warehouse?
- What is a structure and why is it configured by asset type?
- What is the purpose of the "Manage stock" checkbox in an input?
- What happens when an input has the "Manage stock" checkbox disabled?
Was this page helpful?