What is a program?

2 min read

In Consumer Evolution, a program allows you to define maintenance plans for the assets registered in the system.

Each program defines the task to be performed, on which assets, and under what conditions its planning should be generated . This allows for the organization of maintenance tasks that are repeated based on time, asset usage, or specific conditions.

How is a program structured?

A program consists of a general configuration and one or more planning details .

General information identifies the program and defines the conditions that will govern its operation. Details specify which tasks must be performed, on which assets or components, and under what conditions their planning must be generated.

Types of triggers

Consuman Evolution allows the use of different activators depending on the criteria used to perform the maintenance.

Activator type When to use it? Operation
For a time When maintenance needs to be performed on a specific schedule. Generates plans according to defined time periods, taking a base date as a starting point.
By frequency When maintenance depends on the accumulated use of the asset, such as operating hours, kilometers, or cycles. It connects to a meter and uses the recorded readings to determine when to generate the schedule.
By time and frequency When maintenance must be performed based on time or usage level. It combines a time condition and a frequency condition. The task is activated when either of the two conditions is met first.
By double frequency When maintenance must be controlled by two different usage criteria. It allows you to configure two meters to determine when to run the task.
Per event When the task must be generated upon fulfillment of a certain condition. Generates a plan based on a condition related to a measurement, failure, or response.
Predefined days When the task must be planned on pre-established days. It automatically generates the corresponding schedules, maintaining a limited number of current appearances according to the configured unit.

Relationship with planning

When the condition defined in the trigger is met, the program generates the corresponding schedule for the configured task.

These tasks can be viewed and managed later from Operations > Planning .

📌 The programs allow you to centralize different maintenance criteria within the same plan, using the most appropriate trigger for each task.