Triggers allow you to define when the planning of a task included in a program should be generated .
Each detail of the program can use a different trigger depending on the required maintenance criteria: elapsed time, asset usage, combination of conditions, fulfillment of an event, or previously defined days.
Configure a trigger
- Go to Operations > Programs .
- Create a new program or log into an existing one.
- Add or edit the corresponding details.
- Select the trigger type .
- Complete the required information for the selected type.
- Save the changes.
[IMAGE: Detail of a program showing the Trigger Type field and available options]
Time-based activator
Use By time when the task needs to be planned according to a specific schedule.
Repeat each
Specify the number of time units that must elapse between each execution.
Unit of time
Select the unit used to calculate the periodicity:
- Day.
- Month.
- Year.
Base date
Specify the date from which the configured periodicity will begin to be calculated.
[IMAGE: Setting up a Time-based trigger showing Repeat every, Time unit, and Base date]
Frequency activator
Use By frequency when the execution of the task depends on the accumulated use of the asset, such as operating hours, kilometers or cycles.
This type of trigger is related to an accumulated meter and requires recording readings to update the value used by the program.
Meter
Select the meter used to monitor the frequency.
Repeat each
Indicate the frequency with which the task should be performed.
Base frequency
Complete the value used as a starting point for calculating the next runs.
[IMAGE: Configuration of a By Frequency trigger showing Meter, Repeat every and Base frequency]
Time and frequency trigger
Use By time and frequency when the task must be performed upon fulfillment of one of two conditions:
- A specific period of time.
- A specific meter reading.
The schedule is generated when either of the two configured conditions is met first.
To configure it, complete the data corresponding to the time trigger and the frequency trigger.
[IMAGE: Setting up a trigger by time and frequency showing both conditions]
Dual frequency activator
Use Dual Frequency when the execution of a task needs to be monitored by two different meters.
This type of activator allows considering two criteria for using the asset within the same program detail.
[IMAGE: Dual-frequency trigger configuration showing the two associated meters]
Event trigger
Use By Event when the task needs to be planned as a result of a specific condition and not through a fixed periodicity.
The event may be related to:
- A data point recorded in a measurement.
- A failure.
- One answer.
When the configured condition is met, Consuman Evolution generates the corresponding schedule for the task.
[IMAGE: Configuration of an Event Trigger showing the condition type and its values]
Activator for predefined days
Use predefined days when it is necessary to generate several future plans for the same task in advance.
When saving the program, Consuman Evolution automatically generates schedules based on the Base Date and maintains a limited number of current appearances according to the configured time unit.
Repeat each
Indicate the frequency with which the plans should be generated.
Unit of time
Select the unit used to calculate future occurrences.
Base date
Indicate the date from which the planning will begin.
Next execution date
It displays the next scheduled date according to the defined configuration.
Date until
It allows you to set, where appropriate, a deadline for generating plans.
The number of current appearances depends on the selected time unit:
- Weekly: 5 appearances per day configured, with a minimum of 5 and a maximum of 35.
- Monthly: 12 appearances.
- Annual: 2 appearances.
The generated occurrences are available in Operations > Planning , where it is possible to generate a new work order or assign them to an existing order.
As appearances progress through work orders, the system generates new schedules to maintain the corresponding current quantity.
[IMAGE: Predefined Days trigger configuration showing Repeat every, Time unit, Base date, Next run date, and Date until]
Once the trigger is configured, the program uses the defined conditions to determine when to generate the schedule for each task.
The generated plans can be viewed and managed from Operations > Plans .